Image

Fegi *********

Sr. Field Operator

Indonesia

Total Years of Experience in Petrochemical Plant/PP Plant/Ethylene Cracker Plant/AA Plant : Petrochemical Plant 5 years/ Ethylene Cracker Plant 1 years 3 month
Current Location : Cilegon, Indonesia

Work Experience
December 2018 - April 2022
Field Operator and DCS
PT Sulfindo Adiusaha

1. Make a logsheet, check list of the process (Brine, Electrolyzer, Cl2, H2, Depleted Brine)
2. Perform OBC (Operating Basic Care) in pump process
3. Troubleshooting issues in production equipment & process
4. Monitor and Make sure quality & quantity production when process running normal, safely, and smooth with proper data an approved format accordance with SOP
5. Preparation after trip or planning shutdown with team electrical, technical, instrument and mechanic for leak test, stroke check, interlock systen
6. Monitor DCS like flow chemical, interlock, temperature, flow, pressure, purity product with SOP

April 2022 - Agustus 2023
Field Operator and DCS
PT Air Liquide

Understand and Implement:
1. Industrial Management System (IMS)
2. Quality Management System (QMS ISO 9001:2015)
3. Environmental Management System (EMS ISO 14001:2015)
4. Halal Assurance System (HAS23001)
5. Sistem Manajemen K3 / OHS Management System (Peraturan Pemerintah Nomor 50 Tahun 2012 Republik Indonesia)
My duties and responsibilities:
1. Completing logsheets and reporting every shift.
2. Start and stop High Pressure Compressor and Low Pressure Compressor.
3. Testing purity H2 with a GC (Gas Chromatograph).
4. Controling production capacity and coordinating cylinders, pallets, and trailers deliveries are all part of the job.
5. Make a cercitifacte product for cylinders, pallets, and trailer H2.
6. Make a pass and monitor the position of the H2 trailer until it returns to the plant
7. Move filled cylinders and pallets to the designated places using a forklift

September 2023 - Present
Sr Field Operator (Cold Section)
PT Lotte Chemical Indonesia

1. Training general for process Naptha Cracker (Hot, Cold, Utility Section) and weekly test for look understanding for lesson
2. Reading PFD, PnId, Troubleshooting, Interlock Sytem for preparation commissioning and prepare running normal operation
3. Studying for analysy report for preparation start-up
4. Preparation for basic training mandatory startup and shutdown (O2 Free, N2 Free, Pressurize, Heating up) so that equipment clean impurities and startup normal after that stabilizing process to get target operational
5. Precommissioning project like to walkdown, hydrotest, airblow, and pneumatic
6. Checking and witness tray tower

Education & Training
2015-2018
Diploma III In Chemical Engineering
Academy Oil and Gas Balongan

Graduated

error: Content is protected !!